Relocation of the road III/42510 in Rajhrad - Study
Kubík, Peter ; Pěknica, Martin (referee) ; Radimský, Michal (advisor)
The aim of the diploma thesis is to design realignment of road III/42510 Stara Posta in Rajhrad, where there will be an intersection with the planned construction of a high-speed railway. The road serves as a bypass of the Rajhrad for trucks, and therefore it is required to maintain traffic even during the construction of the VRT. The study is to find the optimal option and further develop it into drawings of situations, profiles and sample cross-sections.
Measurement of the actual construction of the motorway
Jelínková, Hedvika ; Kratochvíl, Richard (referee) ; Vondrák, Jiří (advisor)
The aim of this bachelor thesis is to survey the actual state of highway, particularly its planimetry and hypsography with its subsequent processing into a thematical map. The map is carried out scale 1:500, in the 3rd accuracy class according to ČSN 01 3410 and is connected to obligatory reference systems S-JTSK and Bpv.
69 / 5000 Výsledky překladu Reconstruction proposal for the section of the D46 motorway and the Vyškov level crossing
Kozminský, Marek ; Hornýš, Michal (referee) ; Kosňovský, Michal (advisor)
This diploma thesis deals with proposal for reconstruction of the section of the D46 motorway and the adjacent motorway junction designated as Exit 2 Vyškov. The area in question is located in the non-built-up area of the town of Vyškov. The D46 motorway crosses first-class road number II/430 at this point, which connects with the II/430 road at the intersection. The intersection we are concerned with is plagued by several problems. The first is the unsatisfactory connection of road number II/430 in the eastern part of the intersection, where the indirect branch has no slip road, meaning that vehicles are forced to stop here, resulting in clogging of the exit from Vyškov to Olomouc. Another problem is the turn-off to the petrol station in the western part of the intersection. The problem occurs at the location of the turn-off to the previously mentioned petrol station, where approximately 100 m from the turn-off there is an indirect branch of the western part of the intersection and vehicles wishing to join the D46 motorway are forced to slow down there.
Highway bridge over the valley Polančice Brook
Dvořáková, Anna ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
Diploma thesis deals with design pre-stressed highway bridge over the valley Polančice Brook and cart track. There are designed 4 studies, from which variantion double-chamber girder with 4 spans in chosen. It is elaborated a detailed structural analysis and bridge is considered a proposal to limit states for temporary and permanent design situations according to European standards - Eurocodes. It is developed drawings and visualization of bridge and construction process.
Design method for estimation of unit value of extrication works after an accident using selected special technologies for removing the traffic obstacle on a motorway
Lebeda, Ondřej ; Bradáč, Albert (referee) ; Libertín, Josef (advisor)
This thesis is a minor part of the overall project on the establishment of a general methodology of calculation of the cost of rescuing a lorry. It deals with legislation related to goods vehicle extrication, analysis of costs and costs as a result of exhausts for selected special equipment after an accident. The work is a guide for experts from the Institute of forensic engineering, on the basis of who can more easily establish a procedure and the unit price recovery work after the accident. Then speeds up determining the prices for example during the court proceedings and the payment of the profits of a business.
Design of bridge on highway D1
Kopřiva, Jan ; Nováček, Jan (referee) ; Zich, Miloš (advisor)
The purpose of this thesis is to design bridge over the valley on D1 highway. Length of the structure is 170 meters. Main structure is four spans prestressed beam. The length of fields is 36+48+48+36 meters. The structure is examined in all phases of construction, including the operating phase according to valid standards.
Design method for estimation of unit value of extrication works after an accident using selected special technologies for removing the traffic obstacle on a motorway
Lebeda, Ondřej ; Bradáč, Albert (referee) ; Libertín, Josef (advisor)
Abstract (example) This thesis is a minor part of the overall project on the establishment of a general methodology of calculation of the cost of rescuing a lorry. It deals with legislation related to goods vehicle extrication, analysis of costs and costs as a result of exhausts for selected special equipment after an accident. The work is a guide for experts from the Institute of forensic engineering, on the basis of who can more easily establish a procedure and the unit price recovery work after the accident. Then speeds up determining the prices for example during the court proceedings and the payment of the profits of a business.
Modification the plan of construction of linear structures
Mudrák, Miroslav ; Kocanda,, Pavel (referee) ; Nový, Martin (advisor)
Submitted thesis deals with planning of an implementation of a linear construction by using the contract conditions. The theoretical describes the topics of project management, engineering, procurement and traffic politics of Czech Republic. It also describes the history, status and development of the highway network. In the end there is introduced the modernized section of the D1 highway. The practical part deals with the application of the modified project Modernization solutions to the D1 highway - section 22 by introducing a shift operation during the construction. It solves the impact of shift work on phasing construction schedule, financial plan and compares the positive aspects of the solutions against the negative ones. In conclusion there is an evaluation effectiveness of the actual and modified variants of the construction.
Highway bridge at Soběslav - preparation, implementation and project management
Topinka, Jiří ; Špinar, Petr (referee) ; Hrazdil, Václav (advisor)
Master´s thesis processes Construction technology project and implementation of bridge at Soběslav on the route D3, section D3 Tábor – Veselí nad Lužnicí, concretely SO 7-216 Bridge over the route III/15527, Černovický stream and biocorridor km 94,100. This is a permanent road bridge about 25 fields with the continuous construction of precast prestressed concrete beams longitudinally coupled concrete slab.
Study of R43/ I/43 Grade Separated Junction
Libichová, Jana ; Janda, Michal (referee) ; Radimský, Michal (advisor)
Aim of this Master´s thesis is the road adjustment and design of new grade separated junction highway R43 and road I/43,of Černá Hora – Svitávka and to design optimal distribution of transport hubs including the design II/150 and III/37429, which should be connected with existing roads.The adjustment of the routes will be designed in the necessary extent with the optimal distribution of transport hubs regarding the best transport and economical solution and with minimal impact on the enviroment.